21-day fixed-shift cycle
7 on, 3 off. 7 on, 4 off.
A long-block roster with two work runs and a four-day recovery break at the end of every cycle.
Build it in ShiftFlowrExact preset
The full 21-day cycle
ShiftFlowr applies one chosen shift type to both seven-day work blocks. The dates move through the week because the full cycle lasts exactly three weeks.
7 on3 off7 on4 off
21 daysFull cycle
14 shiftsPer cycle
56 hoursWeekly average at 12 hours
The average is high when every shift lasts 12 hours. Check your
contract, breaks, and local working-time rules rather than assuming
every employer uses the same shift length.
Build the correct phase
Pick the preset
Select 7-3-7-4 from the pattern library.
Choose day one
Set the date your current seven-shift run began.
Check the preview
Confirm both rest blocks land on the dates your rota shows.
7-3-7-4 FAQ
- Does this preset rotate days and nights?
- No. The built-in version uses your selected fixed shift type. Build a custom sequence if your employer changes shift type within the 21 days.
- Why does the anchor date matter?
- It determines whether any date falls in the first work block, the three-day break, the second work block, or the four-day break.